SALIENT FEATURES FOR NOAPARA – NEW GARIA (KAVI SUBHASH)
Sl No
Features
Details
1.
Cost of Projects
(i)Dum Dum – Tollygunge: 1716.95 Cr.
(ii)Tollygunge – New Garia (Kavi Subhash): 1092.08 Cr.
(iii)Dum Dum – Noapara: 4829.57 Cr.
2.
Year of Original Sanction
1972
3.
Route Length for commercial operation
27.280 Km (Double Line) From Noapara to Kavi Subhash
4.
Underground/Elevated/Surface
(iv)Underground: 15.672 Km (15 Stations)
(v)Via duct: 10.883 Km (7 Stations)
(vi)Surface: 0.725 Km (2 Stations)
5.
Number of Stations
24
6.
Maximum permissible speed
55 KMPH
7.
No of Curves
101 Nos (On Up Line) & 106 Nos (On DN Line)
8.
Steepest Gradient
1 in 26.74
9.
Length of Platform
165 to 177 M suitable for 8 coaches.
10.
Traction (Electric)
750 Volt DC 3rd Rail current collection
11.
Type of Track
60 Kg rail on Ballastless track with M1AFittings & M7 Fittings at Points & Crossing.
12
Distance between Stations
Average: 1.14 km
Maximum: 2.151 km (Dum Dum – Belgachia)
Minimum: 0.597 km (Central – Chandni Chowk)