Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter View Content in Hindi
National Emblem of India

ABOUT US

PASSENGER INFO

NEWS AND RECRUITMENT

ACTIVITIES/EVENTS

TENDERS

METRO PERSONNEL

CONTACT US

 
Bookmark Mail this page Print this page
QUICK LINKS
35105-01-2021
Kolkata
Freight Trains attain "Game Changing" top speed above 90 kmph on newly inaugurated New Khurja- New Bhaupur section of Eastern Dedicated Freight Corridor

Freight Trains attain "Game Changing" top speed above 90 kmph o­n newly inaugurated New Khurja- New Bhaupur section of Eastern Dedicated Freight Corridor. 

Faster speeds would result in faster delivery of goods and faster turnaround reducing freight costs. 

53 Freight trains have run o­n this new section till 03rd January, 2021

In a game changing development, Freight Trains have started to attain top speeds of above 90 kmph o­n newly inaugurated New Khurja- New Bhaupur section of Eastern Dedicated Freight Corridor. Faster speeds would result in faster delivery of goods and faster turnaround reducing freight costs. 

It may be noted that Shri Narendra Modi, Hon’ble Prime Minister had inaugurated the 351 Km New Khurja- New Bhaupur section of Eastern Dedicated Freight Corridor o­n 29.12.2020. Meeting the objectives, the new section is witnessing seamless transportation of major freight commodities at a speed above 90 kmph o­n this newly inaugurated section. So far, 53 freight trains have been operated o­n this new section till 03rd January, 2021. 

Till 03.01.21, Total Trains ran = 53

• Between New Khurja - New Bhaupur (Down Direction) = 32

Best Speed achieved = 93.70 kmph

• Between New Bhaupur - New Khurja (Up Direction) = 21

Best Speed achieved = 85.98 kmph

After the commissioning of this new section, Coal, Jute, Petroleum, Container, Iron & Steel and other minerals are primary commodities moving towards NCR and Punjab & Haryana area whereas Rice, Wheat and Food grain products from Punjab and Haryana area, Fertilizer, Steel, Coal loadable empty wagons etc are moving towards eastern India.

It is noteworthy that in the inaugural run, two freight trains were flagged off, 1.5 KM Long Haul 9400 Gross Ton Train loaded with Food grain from Mullanpur & Faridkot of Ludhiana, Punjab between New Khurja and New Bhaupur and 1.5 KM Long Haul 10420 Gross Ton Train loaded with Power House Coal from Chruri Siding Ray, Ranchi, Jharkhand & Dudhichua Wharf Siding, Singrauli, Madhya Pradesh between New Bhaupur and New Khurja of DFC network. o­n the return journey after unloading, the above rake achieved a speed of 90 kmph over DFC.

In the first phase, DFCCIL is constructing the Western DFC (1504 Route km) and Eastern DFC (1856 route km including PPP section of Sonnagar-Dankuni Section. The EDFC starting from Sahnewal near Ludhiana (Punjab) will pass through the states of Punjab, Haryana, Uttar Pradesh, Bihar and Jharkhand to terminate at Dankuni in West Bengal. The Western Corridor connecting Dadri in Uttar Pradesh to Jawaharlal Nehru Port (JNPT) in Mumbai will traverse through the states of UP, Haryana, Rajasthan, Gujarat and Maharashtra of WDFC & EDFC (excluding the Sonnagar – Dankuni PPP section) i.e. 2800 route Km will be commissioned by June 2022.





  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.