Indian Railway main logo
Search :
Increase Font size Normal Font Decrease Font size
   View Content in Hindi
National Emblem of India

ABOUT US

PASSENGER INFO

METRO RAILWAY NEWS

METRO CHETNA

TENDERS

METRO PERSONNEL

CONTACT US






 
Bookmark Mail this page Print this page
QUICK LINKS


Salient features for DumDum - New Garia (Kavi Subhas)

Sl. No.

Features

Details

1.

Cost of Project

(i)Dum Dum – Tollygunge :Rs. 1716.95 Cr.

(ii)Tollygunge – New Garia: Rs.1092.08 Cr.

Total:Rs.2809.03 Cr.

2.

Year of original Sanction

1972

3.

Route Length for Commercial operation

27 Km. (Double Line) from Dum Dum to Kavi Subhas including yards.

(i)Underground: 15.20 km.

(ii)Viaduct: 10.0 km

(iii)On surface: 1.80 km

4.

Number of Stations

23

(i)Elevated: 6 Nos.

(ii)Underground: 15 nos.

(iii)On surface: 2 nos.

5.

Maximum permissible speed

55 KMPH

6.

Minimum radius of curvature in block section

200m

7.

Ratio of length of track on curve to total length

64% for UP & DN lines.

8.

Steepest grade

1 in 60

9.

Length of Platform

165 to 177m

10.

Traction (Electric)

750 V DC 3rd Rail Current collection system

11.

Type of Track

Ballast less with M1A track fittings.

12.

Distance between Stations

Average: 1.14 km

Maximum: 2.151 km (DumDum – Belgachia)

Minimum: 0.597 km (Central - Chandni Chowk)



 




Source : Metro Railway Kolkata / Indian Railways Portal CMS Team Last Reviewed on: 21-09-2015  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.